Excited to wrap up the backyard project!
AFTER
BEFORE
1. Moved the AC from the back to the north side of the house, in the shade.
2. Removed the old DIY bump-out from the back of the house. The fascia was built up over the edge of the shingles.
3. Re-sided the back with white trim and cedar shakes in the dormer. Wish I had enough cash to do all the dormers in cedar shakes and all the windows in white trim, love this look.
4. Tore out the old patio. The concrete was settling/sloping into the house and causing the back threshold to rot and the foundation to mold.
5. Replaced the rotting fence facing my neighbor and updated the gates.
6. Added electricity to the back; back door lights inside and outside, and an outdoor socket
AFTER
BEFORE
1. Moved the AC from the back to the north side of the house, in the shade.
2. Removed the old DIY bump-out from the back of the house. The fascia was built up over the edge of the shingles.
3. Re-sided the back with white trim and cedar shakes in the dormer. Wish I had enough cash to do all the dormers in cedar shakes and all the windows in white trim, love this look.
4. Tore out the old patio. The concrete was settling/sloping into the house and causing the back threshold to rot and the foundation to mold.
5. Replaced the rotting fence facing my neighbor and updated the gates.
6. Added electricity to the back; back door lights inside and outside, and an outdoor socket
No comments:
Post a Comment